OUR PROCESS
Our expertise and collaboration with industry-leading partners ensures our process capability and quality continues to set industry standards.
-
HANG UP THE PRODUCT
With a power and free conveyor, we can hang products with a max 750kg per load bar
-
PRODUCT ENTERS THE PRETREATMENT SPRAY TUNNEL
Degrease
Pickling
Activation
Trication zinc phoshpatation
Passivation and rinse with demi-ionised water -
PRODUCT MOVES TO THE DRYING OVEN
The oven will heat up to 200°C
-
THE PRODUCT MOVES INTO A BOOTH
The product moves into the powder spraying booth, that houses 26 guns
-
THE PRODUCT MOVES INTO THE CURLING OVEN
Step 1 - Infra Red in order to prevent colour contamination
Step 2 - Gas oven at 200°C -
THE FINISHED PRODUCT IS REMOVED
Your product is now protected by our superior corrosion-resistant coating.
-
READY FOR COLLECTION
Our centralised location ensures simplified and speedy logistic management.